Maserati Ghibli Forum banner

1 - 4 of 4 Posts

·
Registered
Joined
·
10 Posts
Discussion Starter #1
To those who have done a successful engine removal and install...any tips or advice?

I have a 2014 Ghibli with a seized engine. Bought a 2015 engine with 9K miles on it as a complete engine for 5250$.

They said it took the dismantled 2 hours to remove the engine from the top.

Any tips? I will be doing this without a lift.
 

·
Registered
Joined
·
131 Posts
All of the ones I’ve done were from the bottom. All I have to say is good luck without a lift and take a lot of pictures.
 

·
Registered
Joined
·
432 Posts
have done enough, used lift table with support jig for front subrame/engine/trans.
i've seen a picture of it done through the top, seems more headache than its worth.
 
1 - 4 of 4 Posts
Top